เข้าสู่ระบบ สมัครสมาชิก

running rigging การใช้

ประโยคมือถือ
  • The ship has over of running rigging and approximately of sail area.
  • Often also the running rigging was handled by motor winches instead of manpower.
  • Ketch or Sloop rig with aluminum spars and stainless steel standing and running rigging.
  • All the yards are manipulated by a complicated arrangement of cordage named the running rigging.
  • Modern Albacore designs have evolved sophisticated control systems for their running rigging and standing rigging.
  • A "'rigger "'worked the running rigging and furled and released sails.
  • Moveable lines that control sails or other equipment are known collectively as a vessel's running rigging.
  • Similarly all the Westcoaster's running rigging came back to the cockpit making her easy to handle single-handed.
  • Part of the running rigging, topping lifts are primarily used to hold a boom up when the sail is lowered.
  • Knowing the names of the sides and corners help understand the running rigging and sail trim of the modern junk sail.
  • Sails, spars, running rigging, cradle, insurance, and shipping charges from Norway were included in the price.
  • Throughout antiquity, both foresail and mizzen remained secondary in terms of canvas size, although large enough to require full running rigging.
  • She featured a ballasted rudder, dual-speed winches below decks, and a cork-decked aluminium topside that hid running rigging.
  • Typically, windjammers are equipped with semi-mechanized rigging, steel profile masts and yards and steel cables as running rigging where possible.
  • All her braces, the great part of the running rigging, and her main and mizen top-sail sheets were shot away.
  • "A stay is part of the standing rigging ( as opposed to the running rigging ) and is used to support the weight of a mast.
  • The foresail became fairly common on antiquity, both foresail and mizzen remained secondary in terms of canvas size, but still large enough to require full running rigging.
  • The ship was moved to Denny's yard to have her masts fitted, and then on 20 December towed downriver to Greenock to have her running rigging installed.
  • Two-and-a-half miles of running rigging support a total of of canvas on two masts and 13 sails, controlled by 85 lines on deck.
  • The foremast was square rigged while the other three or four masts were fore-and-aft rigged, barquentine fashion but carrying very simplified standing and running rigging.
  • ตัวอย่างการใช้เพิ่มเติม:   1  2